Four Seasons

Ambient Dynamic Project

Four Seasons

Ambient Dynamics did a chiller plan update and it was one of our first overseas projects in Four Seasons Mexico.

The premises was originally equipped with three 200 ton screw chillers.

Client was looking to replace due to antiquity of equipment , and to remove the secondary hydronic loop

Equipment:

400 tons oil free chiller with Turbocor Magnetic Compressor
200 tons Modular Heat Recovery Chiller

Equipment Benefits:

State of the art design
Simultaneous chilled water and hot water
Reduced energy consumption
Removed the secondary pumping package
Modern and reliable technology
Four Seasons

Contractor: ICASA